Getting messy mixing concrete for the base of the tower on Wednesday
19 July 2000
Click any picture to enlarge it.
|
 |
A shot into the finished hole for the base. I ran into ledge at 3.5'. A rebar cage was
in the hole before I poured. No pictures of that.
|
 |
Anna wanted to see the sandpile before I got started. Sophia came along for the ride.
|
 |
I am nearing the end, and still smiling. Notice the large pile of empty bags...38 to be exact.
|
 |
Grabing the last bags I will need! Anna needs the hearing protection from the generator.
|
 |
Only one more to go!
|
 |
The last batch is mixing. The noise got to be too much for Anna.
|
This page
was last updated on
Tue, 23 Aug 00 at 23:13
Return to Construction page.
|